Dewatering

The Fast Flow Pumps crew headed out to Louisiana to help one of the largest rigs in the world make its journey across the pond to Turkey. The Nobile Jim Day has been docked at Harbor Island since 2016. The rig was manufactured in 1999, and was upgraded in 2010 to operate in a water depth of 12,000 feet and drill to a depth of 37,000 feet. Fast Flow’s equipment was successfully used to pump out the excess water that was causing the rig to list roughly 5 degrees. 

Hydraulic System in front of Vessel 1 scaled
Offshore Oil Dewatering